RECENT PROJECTS

VOC Exposure & Explosion Control Systems

Colourful Solutions

The Flint Group are world leaders in the manufacture of offset printing blankets. The blankets are produced on a series of coating lines in which a solvent-rich rubber compound is added to a fabric carcass. The blankets are heated within the coatings lines, resulting in large amounts of solvents being emitted.

It is critical that the solvent vapours are extracted from the process and abated in a safe manner, reducing the risk of explosion within the process and minimising the impact on the environment.

In order to maximise production output, the client required and improve control of airborne solvents and temperature levels within different sections of the ovens. The balancing of heat across the length of the ovens whilst minimising airflow rates allowed for an improved and efficient removal of retained solvents.

Minimising the airflow across the ovens allowed and increased solvent-rich airflow to the regenerative thermal oxidiser. The level of solvent was never allowed to exceed 25% of the lower explosion limit (LEL); avoiding the risk of an explosive atmosphere being created within the ovens.

The designs that MECHon produced allowed the coating ovens to operate at speeds 40% higher than original (with corresponding increases to output) The quality of product was improved, with more consistent retained solvent levels across the length and width of the blankets. There was a significant reduction in natural gas use on the thermal oxidiser, due to the higher solvent content within the process air.

Similar Case Studies

Dust Booth

Environmental Control Booth for Carbon Fibre Cutting

Click to See Full Details

Laboratory Cabinets

Laboratory Expsoure Control. Safety Cabinets and Curing Ovens

Click to See Full Details

GKN Aerospace

Alumnium Dust Control on CNC Profiling Machine

Click to See Full Details

Wet Scrubbing

Removal of harmful gases from flammability testing facility

Click to See Full Details

Send Us an Email

How We Work.....

With our in-house team of technical experts, we are able to delivery complex high-technology solutions, within strict cost and time constraints. We are able to consider all aspects of the project to ensure that the operation of processes or supporting services are not affected by the introduction of new systems.

Design

We work with our clients to develop the initial strategic brief. This brief is then evolved into conceptual and final design specification.

Project Management

Our management procedures have evolved with our experience to delivery projects on time and on budget.

Z

Validation

We verify the design and equipment selections of contractor and validate any installations to ensure their correct and safe operation.