F1 Racing

Environmental Control Booth

Innovative Thinking

The Client manufactures high performance road cars and Formula 1 racing cars UK. MECHON was commissioned to design an environmental control booth (ECB) to control dusts and fumes generated during the cutting and grinding of carbon fibre components within the research and development department. The design remit proved very restrictive when considering space limitations, ATEX, noise control, and lighting.

The final concept design resulted in an environmental dust control booth with three-stage filtration—absolute filters being used on the final stage. The selection of disposable filters meant that no explosion relief or suppression is required.

A series of mixed flow fans were utilised to achieve a cross flow velocity of 0.7m/s . The fans are used to ensure a continued booth operation even with high dust loading on the filter elements.

The filtered air is re-circulated back into the room after attenuation through splitter type silencers, ensuring that noise levels do not exceed 75dB(A) when the booth is in operation.

A bespoke electrical control panel monitors that filter bank and the airflow rate of all fans, ensuring that employees are protected at all times.

Similar Case Studies

GKN Aerospace

Alumnium Dust Control on CNC Profiling Machine

Click to See Full Details

Transport Research Lab

Road Surface Test Lab LEV Systems

Click to See Full Details

Formula 1

Dust Control System for Alumnium SLM Facility

Click to See Full Details

Akzo Nobel

Centralised vacuum system for paint powder control.

Click to See Full Details

Send Us an Email

How We Work.....

With our in-house team of technical experts, we are able to delivery complex high-technology solutions, within strict cost and time constraints. We are able to consider all aspects of the project to ensure that the operation of processes or supporting services are not affected by the introduction of new systems.

Design

We work with our clients to develop the initial strategic brief. This brief is then evolved into conceptual and final design specification.

Project Management

Our management procedures have evolved with our experience to delivery projects on time and on budget.

Z

Validation

We verify the design and equipment selections of contractor and validate any installations to ensure their correct and safe operation.