Case Study
Akzo Nobel
Central Vacuum System
Leaders in Surface Finish Technology
Akzo Nobel (ICI Paints) is one of the largest producers of speciality coatings and paints in the world. As part of the their commitment to a sustainable environment, ICI have developed a range of solvent-free paints.
The client commissioned the design of a new production facility to manufacture the new product range.
MECHON was responsible for the design and proejct management of all dust control and ventilation systems, needed to ensure a safe and comfortable working environment.
A centralised vacuum cleaning system (CVC System) was installed to safely remove any powders containing hazardous substances from the facility. The CVC system comprises various fixed hose connection points into which employees can connect a combination of cleaning tools. The each connection points was in turn connected to a system of fixed ERW pipework spanning the plant at high level.
A high efficiency cartridge filter was utilised with final stage HEPA filter. The cartridge filter relies on reverse-jet cleaning of the filter elements to ensure a continuous 24/7 operation. A side-channel exhauster was selected to provide the required extraction rates at the tools. The unit was fitted with an acoustic housing and silencer to ensure reduced noise levels to the surrounding area.
Similar Case Studies
Wet Scrubbing
Removal of harmful gases from flammability testing facility
Send Us an Email
How We Work.....
With our in-house team of technical experts, we are able to delivery complex high-technology solutions, within strict cost and time constraints. We are able to consider all aspects of the project to ensure that the operation of processes or supporting services are not affected by the introduction of new systems.
Design
We work with our clients to develop the initial strategic brief. This brief is then evolved into conceptual and final design specification.
Project Management
Our management procedures have evolved with our experience to delivery projects on time and on budget.
Validation
We verify the design and equipment selections of contractor and validate any installations to ensure their correct and safe operation.